Milk reception unit automated control system

Project Prerequisites

Need for a new control system for milk reception unit

Goal of the project

Full automation of the milk reception unit

Description of the project

Within the project, our specialists developed design documentation, software, installed the control cabinet, carried out wiring and commissioning works. The software allows to receive milk from milk haulers in automatic mode, with data synchronization with ERP system (1C: Accounting)

Results of the Project

  • Modern and reliable control system was commissioned;

  • Consumed energy sources (electric power, compressed air, ice water, water) accounting function and information output in reports was implemented;

  • The system provides all necessary functions in manual and automatic modes;

  • The human factor is minimized;

  • An intuitive and modern interface of a mnemonic scheme with maximum clarity and ease of operation was developed.